5,000+ Bores.
Zero Half-Measures.

From small residential crossings to major multi-bore highway packages, DTU's track record runs across the entire state of Florida and into the Southeast.

We've Bored
Across Florida

From the Panhandle to Miami-Dade, DTU has completed thousands of crossings under Florida roads. Now expanding northeast and northwest across the entire Southeast territory.

Completed Bore Location
Expanding into 2026
Add Your Project to the Map
Highway
Marion County, FL
SR 326 Water Main Crossing — FDOT
Bore Length380 LF
Casing16" Steel
Carrier12" DIP Water
MethodJack & Bore

Multi-lane state road crossing for Marion County Utilities expansion. FDOT-permitted, nightwork bore completed ahead of schedule with zero lane closures during peak hours.

Fiber / Telecom
Jacksonville, FL
I-95 Fiber Optic Conduit Package
Bore Count6 Crossings
Avg. Length220 LF ea.
Casing4" HDPE Conduit
MethodHDD

Six-crossing fiber optic installation package under I-95 interchange in Duval County. HDD with bore log tracking provided to owner. All crossings completed within 10-day window.

Force Main
Hillsborough Co., FL
Tampa Road Force Main Crossing
Bore Length290 LF
Casing20" Steel
Carrier16" Force Main
Grade CriticalYes — 0.5%

Grade-critical force main crossing under a 4-lane arterial in Tampa. Tight grade tolerance required precision boring and real-time bore log verification throughout the shot.

Electric
Alachua Co., FL
County Road 222 Electric Conduit Crossing
Bore Length160 LF
Casing8" Steel
Carrier4" PVC x2
ClientGRU / Contractor

Dual conduit pull for electric utility expansion project. County right-of-way permit pulled and managed by DTU. Boring complete in one shift.

Gas Pipeline
Sumter Co., FL
US-301 Gas Line Crossing — The Villages Area
Bore Length200 LF
Casing12" Steel
Carrier6" Gas Main
Annular FillYes — Grout

Gas utility crossing through high-traffic US highway corridor. Annular space grouted per utility specifications. Completed during off-peak hours with temporary signal management.

Multi-Utility
Levy Co., FL
Rural Infrastructure Package — 3 Crossings
Bore Count3 Crossings
Total LF540 LF
UtilitiesWater + Fiber
Duration4 Days

Bundled rural infrastructure project covering three county road crossings in a single mobilization — water main, fiber conduit, and storm drain casing all completed in under a week.

This represents a sample of DTU's portfolio. Full project history and references available upon request.

Start Your Project with DTU