We've Bored
Across Florida
From the Panhandle to Miami-Dade, DTU has completed thousands of crossings under Florida roads. Now expanding northeast and northwest across the entire Southeast territory.
Multi-lane state road crossing for Marion County Utilities expansion. FDOT-permitted, nightwork bore completed ahead of schedule with zero lane closures during peak hours.
Six-crossing fiber optic installation package under I-95 interchange in Duval County. HDD with bore log tracking provided to owner. All crossings completed within 10-day window.
Grade-critical force main crossing under a 4-lane arterial in Tampa. Tight grade tolerance required precision boring and real-time bore log verification throughout the shot.
Dual conduit pull for electric utility expansion project. County right-of-way permit pulled and managed by DTU. Boring complete in one shift.
Gas utility crossing through high-traffic US highway corridor. Annular space grouted per utility specifications. Completed during off-peak hours with temporary signal management.
Bundled rural infrastructure project covering three county road crossings in a single mobilization — water main, fiber conduit, and storm drain casing all completed in under a week.
This represents a sample of DTU's portfolio. Full project history and references available upon request.
Start Your Project with DTU